Free Environmental Consultant Quote Template

Environmental consultants quote because the depth of an impact assessment depends on the project type, the regulatory framework, and whether site investigation is required. A phased quote lets the client commission the desktop assessment first before committing to field investigation costs.

Receipt numberIssue & due dateItemised chargesTax readyPDF downloadNo signup

From

To

Quote expires on this date

Logo

Signature

Live Preview

Verdant Environmental Consulting
QUOTE
#QUO-001
Quoted To
Hillside Quarry Operations
Issue Date
21/05/2026
Expiry Date
20/06/2026
DescriptionQtyRateAmount
Environmental impact assessment1€2,800.00€2,800.00
Regulatory compliance report1€1,200.00€1,200.00
Site investigation and soil sampling1€950.00€950.00
Subtotal€4,950.00
Total€4,950.00

Thank you for considering our proposal.

Frequently asked questions

How much does an environmental consultant charge?

Environmental consulting day rates range from €700 to €1,400 depending on specialisation (contaminated land, ecology, air quality, water). A Phase 1 desktop environmental assessment costs €1,500 to €3,000. A Phase 2 site investigation with soil sampling and laboratory analysis costs €5,000 to €20,000 depending on the site size.

What is included in an environmental impact assessment quote?

An EIA quote covers a scoping report, baseline data collection, impact assessment of each environmental receptor (ecology, water, air, noise), mitigation recommendations, and a written EIA report. Planning authority consultation and public engagement are often separate additional services.

Do environmental consultants charge for laboratory analysis separately?

Yes. Laboratory analysis for soil, water, or air samples is typically passed through at cost from the accredited laboratory, plus a mark-up of 10% to 20% for sample handling. Provide an estimated laboratory budget range in the quote based on the number and type of samples expected.

Back to Quote Generator →