Free Electrical Engineer Timesheet Template

Electrical engineers on consultancy or freelance engagements work across design, specification, testing, and commissioning phases that each require precise time recording for accurate billing. A timesheet that identifies the electrical system or installation being worked on gives clients a clear audit trail and helps project managers track engineering hours against the programme. Detailed records are particularly important on projects where fee reimbursement depends on demonstrating work completed.

Client & projectDaily or hourly breakdownTotal hoursRate & total amountPDF downloadNo signup

Currency

Live Preview

Richter Electrical Consulting
TIMESHEET
#TS-001
Bill To
Alpen Industrial Park AG
Period Start
18/07/2026
Period End
24/07/2026
DateDescriptionHrsRateAmount
2026-05-12MV switchgear specification and single-line diagram design5€130.00€650.00
2026-05-13Cable sizing calculations and cable schedule preparation4.5€130.00€585.00
2026-05-14Site visit and inspection of LV distribution board installation3€130.00€390.00
2026-05-15Commissioning test plan preparation and review with contractor3.5€130.00€455.00
Subtotal€2,080.00
Total€2,080.00

Thank you for your business.

Ready to invoice this work? Go to Invoice tool →

What should an electrical engineer put on a timesheet?

An electrical engineer timesheet records hours by system and project phase, with the date, the task, and the time spent. Note the project, whether the work was design, calculations, a site visit, or commissioning, and the system. Phase-based records support fee claims and let the practice track cost against each project.

Typical line items

  • Date of work
  • Project name or number
  • System (LV, MV, lighting, controls)
  • Phase and task
  • Hours worked
  • Billable or non-billable flag
  • Staff charge-out rate
  • Running total per project

How the work is charged

Electrical engineers often work to a fee by project stage but log hours underneath to manage the budget and bill variations or site attendance by the hour. Commissioning and inspection visits are usually recorded as their own entries.

Payment terms and deposits

A timesheet supports an invoice rather than collecting payment itself. Fees are commonly billed monthly or on stage completion, so keep entries dated and tied to the system and phase for client review.

Tax and compliance

If you are registered for sales tax or VAT, that applies on the fee invoice the timesheet supports, not the timesheet itself. Confirm the rules in your jurisdiction.

Frequently asked questions

How do I record time spent reviewing contractor shop drawings and submittals?

Log each submittal review as a separate entry with the document reference and revision number. 'Review and comment on contractor submittal for LV panel schedule, revision B' is a complete record. This is billable time and on large projects can accumulate significantly during the construction phase.

Should I charge for attendance at factory acceptance tests for equipment I have specified?

Yes. Factory acceptance testing is a professional engineering service. Record the FAT attendance time and any travel separately. Witnessing tests at the manufacturer's facility is standard practice for major electrical equipment and is a legitimate billable activity.

How do I handle time spent on a project variation that was instructed verbally?

Log the time accurately as soon as the variation work begins, and note in the description that it relates to a verbal instruction. Follow up with the project manager to confirm the instruction in writing. Your timesheet record from the point of instruction protects your fee claim even before written confirmation is received.

More free tools

Read the complete timesheet guide to see how to log hours and turn a tracked timesheet into an invoice.

Back to Timesheet Generator